But the grid hasn’t expanded at the same pace. As a result, the operator is increasingly paying wind farms, particularly those in Scotland, not to run. So far this year, the UK has spent more than £1 billion ($1.3 billion) in “congestion costs” to turn off plants that can’t deliver electricity because of grid constraints, and switch on others.
https://activistpost.com/2024/12/uk-pays-wind-farms-1-3-billion-to-shut-down-when-its-windy.html
But the grid hasn’t expanded at the same pace. As a result, the operator is increasingly paying wind farms, particularly those in Scotland, not to run. So far this year, the UK has spent more than £1 billion ($1.3 billion) in “congestion costs” to turn off plants that can’t deliver electricity because of grid constraints, and switch on others. https://activistpost.com/2024/12/uk-pays-wind-farms-1-3-billion-to-shut-down-when-its-windy.html
ACTIVISTPOST.COM
UK Pays Wind Farms $1.3 Billion To Shut Down When It's Windy - Activist Post
Material costs have risen, labor costs have risen, the cost of money has shot up, and opposition to projects has risen.
0 Kommentare 0 Anteile 84 Ansichten 0 Vorschau
Gesponsert
Gesponsert