But the grid hasn’t expanded at the same pace. As a result, the operator is increasingly paying wind farms, particularly those in Scotland, not to run. So far this year, the UK has spent more than £1 billion ($1.3 billion) in “congestion costs” to turn off plants that can’t deliver electricity because of grid constraints, and switch on others.
https://activistpost.com/2024/12/uk-pays-wind-farms-1-3-billion-to-shut-down-when-its-windy.html
https://activistpost.com/2024/12/uk-pays-wind-farms-1-3-billion-to-shut-down-when-its-windy.html
But the grid hasn’t expanded at the same pace. As a result, the operator is increasingly paying wind farms, particularly those in Scotland, not to run. So far this year, the UK has spent more than £1 billion ($1.3 billion) in “congestion costs” to turn off plants that can’t deliver electricity because of grid constraints, and switch on others.
https://activistpost.com/2024/12/uk-pays-wind-farms-1-3-billion-to-shut-down-when-its-windy.html
0 Commentarii
0 Distribuiri
89 Views
0 previzualizare